无码孕妇孕交在线观看,开心综合五月,99热快成人,在线国产h视频观看

您的位置:主頁 > 職業(yè)資格 >
мостовой парк ПМП (англ.версия)
2023-03-13 22:55 自考


快速報名入口


姓名

手機  

Soviet Army.
Engineering corps (Years sixtieth - seventieth) Pontoon-bridging column PMP  (ПМП)

Pontoon-bridging column PMP is designed to provide bridges and ferries. The complete set of PMP equipment is used to construct 60 ton and 20 ton carrying capacity bridges and 20 ton up to 170 ton carrying capacity ferries. The most frequently used ferries are 40-, 60-, 80- ton floating sections and 130-, 170-ton floating and abutment sections.

PMP construction basic characteristics:
1.Ferries and bridges are constructed as entire floating sections;
2.PBC consists of folding four-pontoon sections ready to be used as parts of the bridge or the ferry;
3.The complete set of PMP equipment may be used either as a bridge or as a ferry;
4.Landing pies are not needed for ferry transportation, the ferry may be fixed on the river bottom while loading and unloading;
5.The folding sections decks serve as a road;
6.Light vehicles may move in both directions.

PMP floating bridges basic characteristics:

Bridge carrying capaciry Road width (m.) Maximum length of the bridge (m.) Time needed for installation (min.)

60
20 6.59
3.29 227
382 30
50

PMP ferries basic characteristics:

Ferry carrying capacity (t.) Amount of ferries made of PBC units Number of sections needed per a ferry, units Length of the ferry (m.) Time needed for installation (min.)

floating abutment

40
60
80
130
170 16
10
8
4
4 2
3
4
6
8 -
-
-
1
1 13.5
20.25
27.0
46.0
59.5 8
10
12
13-15
16-20

Pontoon-bridging column PMP is full equipment for bridging through water obstacles . Since1962 the Soviet Army was armed with this type of PMP .

This equipment may be used for as a ferry to carry people and equipment through water obstacles. Besides PMP may include vehicles to transport equipment. The standard set of equipment allows to construct bridges of different length and carrying capacity.
The bridge length may be up to 227 m for 60 ton cargo; or up to 382 m for 20 ton cargo. Permissible current flow is up to 2.5 m/sec. The pontoons upper part is used as a road.
The PMP includes 32 floating sections, 4 abutment sections, 2 road covers, 12 tugboats. The transportation of the sections is performed by 38 KrAZ-255B trucks equipped with special devices.  The boats BMK-90, BMK-130 or BMK-150 are tugged by ZIl-130(ZIL-157) trucks with the help of a trailer or their own wheels . If PBC contains BMK-T boats; they are transported on 12 KrAZ-255B trucks platforms.

The KraZ truck carries one section, which includes two middle and two edge pontoons. The pontoons are connected by hinges. For transportation the section is folded up on the truck platform. The picture displays the truck with a floating section. Next picture is the back view of the truck with the section containing two middle right-angled pontoons and two edge curved pontoons. The abutment section is different from the floating section. Due to its form the abutment section allows to connect the bridge with the bank, besides, the section has folding devices so that cars could go down the bridge to the bank.

The section crew should consist of a driver and two pontooneers. It can also consist of a driver-pontooneer and a pontooneer. The procedure of installing the bridge or a ferry is as follows: the truck moves backward into the water up to the point where the depth is not less than 1 m; then the truck brakes abruptly; the pontooneer releases the hold; the section released rolls down the platform into the water easily.

In the water the section spreads under the influence of floatation powers with the help of hinges. In the picture the section is in the process of spreading (back view). At the moment the section is being hold by a mooring rope from the bank. The other edge of the rope is fixed on the truck. The driver-pontooneer and the pontooneer go up to the deck, lock the bottom and the deck to make the section construction rigid.

In the picture the section is spread (back view). After the deck and bottom are locked the pontooneers bring the sections closer to each other using hooks and lock the sections together. Thus the bridge line is being assembled along the bank. During the procedure the section is hold by mooring ropes fixed on the truck on the bank. As soon as the section is assembled the truck throws the mooring rope and leaves the site. The road width is 6.5 m.







注:以最新的政策為準,本文僅供參考,如有疑問,請及時聯(lián)系在線客服!
圖片由網(wǎng)友上傳,來源網(wǎng)絡,如有侵權,敬請告知刪除!

推薦專業(yè)
招生簡章
學歷相關
cisco
walmart
gamescast
spinwokrx
ngreen
vimeo
友情鏈接:
贏在路上學!“鏅嗨 京ICP備16041791號-1 聯(lián)系我們點擊報名
贏在路上學!“鏅嗨
京ICP備16041791號-1 京公安備110108007008點擊報名 聯(lián)系我們點擊報名

首頁

咨詢

電話

淫乱人妻视频| 国产一区欧美精品| 97在线超碰| 国产美女发骚被操| 精品国精品无码自拍自在线| 女同亚洲一区二区无线码| 色官方导航| 欧美性受xxxx狂喷水| 人妻无码ΑV中文字幕久久| 国产美女黄片久久久| 国产精品一级毛片视频| 欧美日韩在线黄色| 久久丫精品国产亚洲av | 一区二区三区免费| 中文字幕无限亚洲| 白丝爆浆18禁一区二区三区| 一道本久色嚕| 97精品国产| 尤物视频啪啪啪| 东京热AV男人天堂| 蜜桃乱伦视频| 亚洲综合久久婷婷五月| 亚洲无码视频在线观看| 小说激情一区二区| 亚洲中文导航| 日噜噜| 欧美香蕉精品| 国产黄a三级三级看三级| 热久久男人天堂| 九九九九国产精品| 精品久久久久久中文字幕乱码| 三P人妻在线| 男人的天堂黄色| 女同精品| 色五月婷婷性爱视频| 日韩成人免费电影| 韩国国产欧美69| 强奸AV天堂| 国产色欲AV| 欧美极品视频第一页| 亚洲一区二区厕所偷拍|